Sport Ireland National Indoor Arena (Phase 2)

The National Indoor Arena houses three indoor arenas, each one as impressive as the next. The arena has a signature structure that ranges in height from 12 to 17 metres over three levels. Phase 2 of the National Indoor Arena provides permanent indoor facilities for Ireland’s three leading field sports, namely, Gaelic Games, Soccer and […]
City Point, Galway

This entire development totals approximately 24,756sq.ft and includes courtyards, offices, residential and retail space. TOBIN Consulting Engineer acted as Employer’s Representative, preparing contract documents including the design of all civil, structural, mechanical and electrical elements of the works and the Project Management of these services on the tenant and landlord fit out of approx. 2,300m² […]
Shannon Airport

TOBIN’s work with the Shannon Airport Authority (SAA). Shannon Airport, located in County Clare, is one of only three international airports in Ireland. The Shannon region in the west of Ireland is synonymous with FDI investment and expansive multinational activity across a number of key sectors, namely the pharmaceutical and medical device industries. The airport […]
GAA Centre of Excellence

TOBIN partners with the GAA for Connacht Centre of Excellence. TOBIN provided multidisciplinary services for this state-of-the-art facility for Connacht GAA where works were completed over 3 separate phases. Phase 1 included the construction of 5 sand-topped pitches, a 3G synthetic pitch and a 2.2km running track. Phase 2 comprised of the construction of a […]
Sports Infrastructure project at the University of Limerick

Covering a total area of 35,000m², this project involved the provision of 2 full-size GAA pitches, 4 soccer pitches, 1 natural turf pitch, 2 ball walls, a spectator terrace area, floodlighting, access roads, coach parking and set down areas, site services, associated site development works and landscaping. The existing 400m, 8-lane all-weather running track, adjacent […]
Lufthansa Tecknik Internal Wall Demolition

The works will involve internal modifications to the existing Hangar Building which comprise of the demolition and removal of an existing internal wall of approximately 54 meters in length and 20 meters in height. The wall is constructed of block work from ground floor level to a height of 3 meters above ground floor level, […]