Moville Community College

TOBIN’s Health and Safety and Technical Advisory Division (HSTA) is proud to have provided Safety Consultancy services to Donegal ETB for the construction of a two-storey extension to Moville Community College. The works achieved substantial completion recently and were completed while the school remained operational to students and staff. Key features of the project included […]
Naas Community College

Works comprised of the construction of a 10,405m², 1000-pupil Post-Primary school in Naas which includes teaching accommodation, a PE hall, a special needs unit with a sensory garden, 3 ball courts and an all-weather pitch. The school is a BER A3 energy-rated building as well as a rainwater harvesting facility to provide free, recycled water. […]
Scoil Mhuire, Oranmore, Co. Galway.

Works included the construction of a new extension to the existing National School at Oranmore, Co. Galway. The civil and structural engineering works comprised of site development work, construction of the new school extension, installation of new foul and surface water sewers and construction of access link. Services provided by TOBIN on this project: Civil […]
Scoil Náisiunta na bhForbacha, Galway

This project comprised of the demolition of the existing school and the construction of a new 8 classroom school on the same site. The civil & structural engineering works included: Diversion of existing underground culvert/drain around the new school footprint and excavation of overburden to bedrock installation of reinforced concrete raft foundations construction of concrete […]
St. Joseph’s Secondary School, Co. Clare

This project at St. Joseph’s Secondary School in Co. Clare consisted of the construction of additional accommodation consisting of a one classroom A.S.D. Facility Extension, as per the standard schedule of accommodation, a General Purpose Hall with stage, boys and girls toilets, changing rooms, accessible assisted WC of, 2 no. stores and associated circulation space. […]
COLAB Letterkenny Institute of Technology

TOBIN was appointed as PSDP for the construction of a 1,240m² two-storey extension to the existing Letterkenny IT Campus Business Development Centre and comprising the new Colab Facility. This project also includes modifications to the existing BDC building. TOBIN Consulting Engineers performed the role of Project Supervisor Design Process as outlined in the Safety, Health […]