• September 13, 2024

    This project was a joint initiative between the National Parks and Wildlife Service (NPWS) and Fáilte Ireland working in strategic partnership which aimed to further develop and expand, and upgrade and enhance, the existing trail system within the Co …

  • February 23, 2022

    The Project involved the refurbishment and fit-out of circa 500 sqm are of the existing warehouse to accommodate the Marine Research Institute (MRI). Works on the building comprised creating 2 No. roller doors and 2 No. personnel access doors to the …

  • Swords Watermain
    November 25, 2019

    As the age-old proverb suggests, necessity is indeed the ‘mother of invention’, and within a construction and engineering context particularly, we have seen time and time again that the primary driving force for innovation is the need to resolve a re …

  • June 7, 2019

    The Vartry Water Supply Scheme provides drinking water for over 200,000 people. With historical significance, it was developed by Dublin Corporation in the 1860s and includes two reservoirs, a water treatment plant, a 4km tunnel under Callowhill and …

  • Ardee Bypass
    June 6, 2019

    TOBIN were appointed by Louth County Council to undertake the Detailed Design and preparation of Tender documents for the proposed N52 Ardee Bypass. The proposed bypass commences in the townland of Mandistown in Co. Meath before crossing the River De …

  • N16 Ireland
    November 6, 2017

    TOBIN was appointed by Leitrim County Council in late 2018 as Design Consultants and PSDP for the pavement and minor improvement scheme for N16 Pollboy to Boleyhill Roundabout, Manorhamilton. The project involved the overlay and inlay of approximatel …

  • May 19, 2017

    Re-engaging with Galway’s maritime past – TOBIN and the Galway Harbour Company. There is little doubt that the Galway Harbour Project has a special place at the heart of the TOBIN business. Having been engaged in the development of this area for over …

  • leixlip
    December 13, 2016

    TOBIN was appointed as Client’s Representative for the Stage 5 expansion of the Leixlip Water Treatment Plant. The expansion, with a capital cost of approximately €30 million, included the construction of a state of the art “stand-alone” facility, on …

  • November 18, 2016

    Following the intense flooding of the Dunkellin River in November 2009, TOBIN was appointed to design a scheme to alleviate flooding between Craughwell and Kilcolgan in County Galway. The works consist of: (1)    Channel deepening in Craughwell villa …

Start typing and press Enter to search