The Barnaderg Group Water Supply Scheme was originally designed in 1971 to provide a demand of 413m³/day to a total of 187 domestic houses between three main supply areas known as Barna, Clandahamper and Dangan.
The works consisted of the replacement of the existing gravity distribution watermain pipes and the replacement of existing valves and meters where required in the scheme.