Moyfin Quarry

Moyfin Quarry is located in a primarily agricultural area within the townland of Moyfin, Longwood, County Meath. Operational since approximately 1950, Moyfin Quarry is a sand and gravel pit owned and operated by Davin Plant Hire Ltd. The overall sand and gravel pit is 20 ha in area and the operations focused on supplying high […]
Refurbishment of Cloon

The overall purpose of this essential project is the security of Ireland’s electrical network between Cloon in County Galway to Lanesborough in County Longford (and onwards) now and in the future. Without the refurbishment of this essential network, electricity, including the transmission of green energy from renewable sources could not be transported to its required […]
GW3D

GSI is moving in the direction of providing three dimensional subsurface models to meet the requirements of stakeholders and end users. The sand and gravel aquifer mapping theme includes desk study, fieldwork, data collation, analysis and reporting. The investigations to date have resulted in mapping of previously unknown sand and gravel deposits, and improved definitions […]
Group Water Scheme

Until the 1960s, piped water to the rural population was unheard of. Community driven schemes filled that gap through the sourcing of local supplies and currently provide drinking water to 6% of Ireland’s population. The National Federation of Group Water Schemes is the representative body for the Group Water Scheme sector. This project seeks to […]
Lufthansa Tecknik Internal Wall Demolition

The works will involve internal modifications to the existing Hangar Building which comprise of the demolition and removal of an existing internal wall of approximately 54 meters in length and 20 meters in height. The wall is constructed of block work from ground floor level to a height of 3 meters above ground floor level, […]
Omeath Sewerage Scheme, Co.Louth

A Preliminary Report was undertaken by TOBIN in 2012 to determine the best location for the treatment of wastewater from the Omeath Agglomeration and to identify the extent of works required to rehabilitate and upgrade the existing wastewater collection system. The current phased development involves provision for a 1000p.e wastewater treatment plant, construction of new […]