Extension Works on the Delphi Resort Hotel

TOBIN Consulting Engineers provided structural engineering expertise in the construction of a new two-storey bedroom wing and ancillary accommodation at the Delphi Adventure Resort. The site is located at Delphi Resort, Leenane, Connemara, Co. Galway. The geography of the site is that of a valley in a mountainous region which has the Bundoraighe River running […]
Sports Infrastructure project at the University of Limerick

Covering a total area of 35,000m², this project involved the provision of 2 full-size GAA pitches, 4 soccer pitches, 1 natural turf pitch, 2 ball walls, a spectator terrace area, floodlighting, access roads, coach parking and set down areas, site services, associated site development works and landscaping. The existing 400m, 8-lane all-weather running track, adjacent […]
GAA National Games Development Centre

This state-of-the-art National Games Development Centre is located in the National Sports Campus in Dublin. This nationally important project for the GAA includes a total of 5 playing pitches, four of which are full size with floodlighting, a 3G synthetic pitch, a highly innovative hurling wall and a pavilion building housing 10 dressing rooms, a […]
Coillte AA Screening for Met Masts

Coillte are currently developing a portfolio of Wind Farm Projects across Ireland, and due to this, are proposing to erect Meteorological Masts. These will be temporary 80-meter guyed lattice Meteorological Masts. These are crucial in the development of wind farms, as precise knowledge of the windspeed is necessary to know how much energy will be […]
On-Site Wastewater Management Training Programme

In Ireland, wastewater from approximately 500,000 houses is treated by on-site treatment systems. It is essential in the interests of public health to ensure the safe disposal of wastewater from a development. A site assessment will determine whether or not a particular site can achieve this. This training programme aims to enable site assessors to […]
CIP Wastewater Call-Offs

The Irish Water 2017-2021 Investment Plan identified 52 No. Wastewater ‘Above Ground’ treatment projects where upgrade works are to be implemented through Irish Water’s gateways from conceptual design, on to construction and project closure. For the purposes of delivery, IW combined these Wastewater projects into works packages and the Wastewater Treatment Plants (WwTP) that are […]