The works will involve internal modifications to the existing Hangar Building which comprise of the demolition and removal of an existing internal wall of approximately 54 meters in length and 20 meters in height. The wall is constructed of block …
A Preliminary Report was undertaken by TOBIN in 2012 to determine the best location for the treatment of wastewater from the Omeath Agglomeration and to identify the extent of works required to rehabilitate and upgrade the existing wastewater collection system. …
Project Alexion involved the provision of a resilient, clean water supply in the Blanchardstown area. The new main has been upsized to allow for more customers to connect in future without the need to construct a new water main. This …
TOBIN Consulting Engineers provided a number of services on this redevelopment project for Emerald Grounds. A brand new 1,960- seater stand was constructed as well as a new training area complete with floodlights, four dressing rooms, referees’ rooms, and a …
TOBIN Consulting Engineers provided Civil and Structural Engineering, Quantity Surveying and PSDP for the new industrial manufacturing building at Poolboy, Ballinasloe, Co. Galway. The building consisted of a 3600sqm production area and with 5m eaves height, a 300 sqm Reception …
Irish Water is working in partnership with Donegal County Council to deliver the Donegal Countywide Watermains Rehabilitation Project as part of the ongoing Donegal Water Conservation Project Stage 3 Scheme. Following a reappraisal of the water main replacement priorities within …
The Glenbeg Water Treatment Plant is designed to treat up to 3,000m3 of water per day. The plant is located on the western shore of Glenbeg Lough on the Beara Peninsula, Co. Cork, and supplies treated water to Castletownbere and …
A Water Order secured under the 1942 Water Supplies Act gave the right to abstract up to 54,145m3 of water per day from Lough Mask. The phased development involved the provision of a supply connection to Westport Town from the …
Over the course of the Longford Central RWSS scheme, two works contract were carried out which significantly improved the existing water treatment and water supply infrastructure. The first contract that was carried out involved the improvement of water treatment facilities …