At TOBIN, An AtkinsRéalis Company, we have 70 years experience in conceptualising and delivering projects for our clients across the Water & Utilities, Building & Infrastructure, Environment & Planning and Roads and Transportation sectors.

Filter Results
February 7, 2024

TOBIN were appointed by Shannon Commercial Enterprises DAC as Civil and Structural Engineers & PSDP for the development of the c40,000 sq.ft. R&D Technology Facilities in Shannon Free Zone including all site development works. The building, which was completed in …

February 7, 2024

This project included the replacement of the existing grass playing pitch with a new synthetic surface playing pitch, new drainage works for the pitch and installation of irrigation pipework all at the Kingspan Stadium, Belfast. The works also involved the …

November 3, 2023

This project consisted of the demolition of the existing bungalow at 105 Salthill Road Upper and the construction of 39 luxury apartments with balconies. The development consists of 2 blocks: Block A is a seven-storey building facing onto the Salthill …

November 3, 2023

TOBIN were appointed by Galway City Council to design a replacement boiler installation (capable of interfacing with a combined heat and power plant, to be installed at a future date), at Leisureland in Salthill. This project involves the preparation of …

November 3, 2023

This project involved the rehabilitation of concrete on former Taxiway 7 and associated concrete works – including recycling crushed concrete, concrete drainage channel replacements, concrete spot slab replacements at Taxiway Hotel 1, Main Terminal Apron and Bullring Apron areas. Associated …

November 3, 2023

TOBIN were appointed to provide Civil & Structural and Traffic Design Services for a Planning Application for a 156,000 sqm Office Development over seven levels at West Gate, Western Distributor Road, Knocknacarra, Galway. Input from TOBIN was required for all …

November 3, 2023

Originally completed in 2002, this four-storey building was originally designed to a high Architectural standard to function as a passively cooled and ventilated atrium office building. However, during its occupancy the building tenants experienced significant issues, of solar glare, overheating …

November 3, 2023

Works consisted of design, tender documentation, PSDP, commercial support, construction supervision and project management of refurbishment works on 5 buildings at Limerick and Inchicore depots. The existing roofs were suffering from varying defects which were impacting the operational functionality of …

November 3, 2023

TOBIN were engaged by Westport GAA in the role of Technical Advisor for the development of a full-size natural grass GAA pitch with floodlights to be located on the Golf Course Road, Westport. TOBIN provided the following services: Services/advice in …