105, Salthill

This project consisted of the demolition of the existing bungalow at 105 Salthill Road Upper and the construction of 39 luxury apartments with balconies. The development consists of 2 blocks: Block A is a seven-storey building facing onto the Salthill Promenade, comprising of 27 apartments. Block B is a four-storey building facing onto Lower Salthill […]

Leisureland Air Handling Unit Retrofit, Salthill Galway

TOBIN were appointed by Galway City Council to design a replacement boiler installation (capable of interfacing with a combined heat and power plant, to be installed at a future date), at Leisureland in Salthill. This project involves the preparation of Contract Documents (under the new Conditions of Contract), construction monitoring and acting as the Project […]

Rehabilitation Of Concrete On Former Taxiway 7

This project involved the rehabilitation of concrete on former Taxiway 7 and associated concrete works – including recycling crushed concrete, concrete drainage channel replacements, concrete spot slab replacements at Taxiway Hotel 1, Main Terminal Apron and Bullring Apron areas. Associated external works include drainage upgrade and diversion works, pavement design, utility protection and associated earthworks. […]

Westgate Campus, Knocknacarra Galway

TOBIN were appointed to provide Civil & Structural and Traffic Design Services for a Planning Application for a 156,000 sqm Office Development over seven levels at West Gate, Western Distributor Road, Knocknacarra, Galway. Input from TOBIN was required for all stages of the planning application process and also included liaison with Irish Water and local […]

Refurbishment and Office Fit-out of Building 156

Originally completed in 2002, this four-storey building was originally designed to a high Architectural standard to function as a passively cooled and ventilated atrium office building. However, during its occupancy the building tenants experienced significant issues, of solar glare, overheating in the summer and excessive cooling in the winter. Hence, the project required thermal modelling […]

Irish Rail Major Roofing Refurbishment Projects

Works consisted of design, tender documentation, PSDP, commercial support, construction supervision and project management of refurbishment works on 5 buildings at Limerick and Inchicore depots. The existing roofs were suffering from varying defects which were impacting the operational functionality of the buildings. The existing roofs varied from steel to timber structures with coverings of Single […]