Regional Biosolids Storage Facility, Dublin

TOBIN is acting as Lead Designer for Design Build contractor Ward & Burke for this significant project, which involves the storage of treated biosolids generated at Ringsend Wastewater Treatment Plant and other facilities within the Greater Dublin Drainage project area. The development comprises two large storage buildings, each measuring 105m in length and 50m in […]
BIA Innovator Campus – Athenry

Aligning with Galway’s designation as the European Region of Gastronomy in 2018, the TOBIN-led BIA Innovator Campus was approved for development in Athenry, Co. Galway. TOBIN worked closely with the BIA Innovator Campus CLG Board to provide high-quality architectural and engineering design services, with a strong focus on health and safety. The contractor’s scope included […]
Penn Engineering Factory Extension, Galway

The proposed development involves the clearance of a greenfield site to facilitate the construction of a two-story factory with a total gross floor area (GFA) of 3,400 square meters. The project includes the development of an access road, landscaping, and all necessary ancillary site works. As part of the expansion of the existing factory, the […]
Ceannt Station Galway

TOBIN were appointed as Assigned Certifier, Civil and Structural Design Engineers and PSDP for the restoration and refurbishment of the existing Former Engine Station building located at Ceannt Station, Galway to be used as a modern office space by Irish Rail. The existing building has a total footprint of 510m² of which 250m² underwent redevelopment […]
Kingspan Stadium – Ulster Rugby

This project included the replacement of the existing grass playing pitch with a new synthetic surface playing pitch, new drainage works for the pitch and installation of irrigation pipework all at the Kingspan Stadium, Belfast. The works also involved the excavation and disposal offsite to a suitably licensed facility of the existing grassed playing pitch […]
University of Limerick, Running Track

The works required the removal and disposal of the existing track surface, the removal and replacement of the existing perimeter fence and gates, along with the excavation and disposal of material for and construction of a new retaining wall and track sections. New kerbing was placed to form a new 100m straight to the track […]