University of Limerick, Running Track

The works required the removal and disposal of the existing track surface, the removal and replacement of the existing perimeter fence and gates, along with the excavation and disposal of material for and construction of a new retaining wall and track sections. New kerbing was placed to form a new 100m straight to the track […]

Charles River Laboratories Redevelopment Project, Ballina.

This project consisted of the provision of new office and laboratory space within their existing facility, as well as a plant room and compound, an external carpark, and other site infrastructure. The project entailed the delivery of the following from Stage 1, Preliminary Design through to Stage 5, Handover: · Detailed design and planning of […]

Aran Sweater Market

Aran Sweater Market, Galway City, Ireland

The completion of the Aran Sweater Market project in July 2018 marked an important social, cultural and economic development for the famous Medieval Quarter of Galway city. This significantly important project is the result of an extensive conservation effort to design a culturally-sensitive outlet for GlenAran from a derelict property cluster located at the bottom […]

Radharc Na Gréine, Galway

The Residential and Commercial Development at Monivea Road, Galway for Greenway Properties Ltd. includes the construction of 54 No. 3 and 4- bedroom timber frame dwellings in addition to a commercial development and all associated civil works including roads, footways etc. These houses are finished to the highest of standards and will be A rated […]

NUI Galway Connacht GAA Air Dome, Mayo

TOBIN is proud to have delivered the world’s largest Sports Air Dome for Connacht GAA in Bekan, Co. Mayo. The Smart Air Dome is located on the site of the Connacht GAA ‘Centre of Excellence’ and measures 150m (l) x 100m (w) x 26m (h). This highspec facility accommodates a full size 4G synthetic GAA […]

Shannon Airport Authority Painting Hangar, Co. Clare

The hangar was designed to accommodate an A380 Aircraft among various other combinations of aircraft. The gross internal floor area of the hangar building is 8,447m² and includes office space, workshops, plant rooms and storage space. Ancillary buildings and structures within the curtilage of the site include an external pump house, gas skid and fire […]