Trascan Solar Farm

TOBIN was appointed to secure planning permission for the Trascan Solar Farm. The proposed development consists of a 60-megawatt (MW) solar farm comprising of photovoltaic panels on ground-mounted frames and a 110 kiloVolt (kV) substation. During pre-planning scoping and environmental assessment of the project, consultation activities took place with a number of parties to inform […]

Derryadd Wind Farm

The project consisted of 24 No. wind turbines, a substation, BESS and a proposed amenity park. From 2016 to 2019, the team undertook a range of environmental and engineering assessments and surveys within and surrounding the boundary of the proposed wind farm application. We were also involved in Public Consultation events, meetings with An Bord […]

Goresbridge Solar Farm

Goresbridge Solar Farm

Planning permission was granted for the 4MW Goresbridge Solar Farm, Kilkenny in 2016. TOBIN managed the planning and environmental assessments for the application, including ecological, landscape, hydrogeological and traffic assessments.

River Mall (Templemore) Flood Relief Scheme

The town of Templemore has a long history of flooding as it lies on the Mall River which drains a catchment area of 22km2 that includes parts of the Kilduff and Devilsbit Mountains, before flowing into the River Suir two kilometres further downstream. The River Mall (Templemore) Flood Relief Scheme is unique as it involves […]

Water Supply Project: Eastern and Midlands Region (WSP)

Water Supply Eastern Midland

Client:  Irish Water Key Facts: Irish Water is responsible for delivering secure, reliable and sustainable water supplies. Extensive studies have been undertaken to identify and assess supply options. Abstraction of water from Parteen Basin, nearby treatment, and a pipeline, was identified as the best scheme for a sustainable supply for the Eastern and Midlands Region. […]

Coillte AA Screening for Met Masts

Coillte are currently developing a portfolio of Wind Farm Projects across Ireland, and due to this, are proposing to erect Meteorological Masts. These will be temporary 80-meter guyed lattice Meteorological Masts. These are crucial in the development of wind farms, as precise knowledge of the windspeed is necessary to know how much energy will be […]