The existing R498 at Latteragh is a single carriageway section which follows the contours around the Latteragh hills, adjacent to the meanders in the Nenagh River. This has led to the road having a sub-standard cross-section and has resulted in …
TOBIN played a pivotal role in the construction of a residential development on Cappagh Road, Galway, for Alber Homes. This project encompassed the creation of 42 units, comprising: 22 modern 3 and 4-bedroom houses 20 versatile 1, 2, and 3-bedroom …
As part of the overall proposed Inner Relief Road which includes approx. 1.1km of link road, footpaths & cycleways to connect to the existing 1.85km section of the Northern Inner Relief Road, the phase 1 works include Junction Upgrades and …
The TOBIN Roads and Transportation team is proud to design numerous Safe Routes to School projects across Ireland. Recently, construction has been successfully completed at schools in Newtowncunningham, Galway City, and Ramelton, delivering safer and more sustainable routes for students. …
The N4/R281 junction in Frenchpark, Co. Roscommon, had been a longstanding safety concern for the community. TOBIN were entrusted with developing solutions to address these challenges and delivered a comprehensive design for a traffic light system, managing the project from …
This extensive Pavement Asset Repair and Renewal Scheme (PARR) spanned two phases covering approximately 10km. The project addressed a range of critical issues including edge subsidence, flooding, roadside hazards, and substandard road geometry, impacting both rural and urban environments. Managed …
TOBIN were appointed as Design Consultant for this project which involved the upgrade of the existing path link from Marsh House to the new Lannagh Bridge, and provided a number of strategically located pedestrian bridges over the Castlebar River, in …
TOBIN were appointed by Wexford County Council to undertake a feasibility study on the Bridgetown River in Bridgetown, County Wexford, aimed at evaluating potential flood mitigation strategies for the village. This initial phase, encompassing data collection, modelling, and analysis, will …
TOBIN was appointed to carry out a review of the CFRAM Hydraulic Modelling and all other relevant water level data in the town of Dromahair and the surrounding catchment, to quantify the risk of flooding to existing properties identified within …