Projects

At TOBIN, we have 70 years experience in conceptualising and delivering projects for our clients across the Water & Utilities, Building & Infrastructure, Environment & Planning and Roads and Transportation sectors.

Filter Results
February 8, 2020

This project consisted of the construction of a 329m² ground floor area extension to the existing receiving area including the provision of 2 no. additional loading docks and all associated siteworks and was completed on Jan 2020. An existing roller …

December 6, 2019

The Volvo/Citroen Car Showroom is located on a serviced 15-acre site within the City North Business Park in Galway. The building consists of a 7.5m high single storey car showroom and workshop with mezzanine offices over a basement carpark (59 …

Castlesaunderson
November 29, 2019

Cavan County Council made an application to An Bord Pleanála for a proposed amenity development at Castlesaunderson Demesne, Belturbet, County Cavan. Castlesaunderson Demesne has enormous historical and geographical significance and has a long history of conflict and recreation. The development …

irish rail edermine
November 21, 2019

Iarnród Éireann’s (IÉ) existing Train Radio system, which provides for safety critical communications between the train drivers and controlling signalmen for train management and regulation, is technologically obsolete and life expired. A programme is currently being undertaken by IÉ to …

portlaoise 2
November 21, 2019

Portlaoise Public Water Supply (PWS) (Drinking Water Code 1600PUB1004) was placed on the Remedial Action List (RAL) in 2014 due to ‘inadequate treatment for Cryptosporidium’.  Nine production wells currently abstract 9,900 m3/d from a Regionally Important Karst Aquifer and a Locally …

Lisheen III
November 21, 2019

TOBIN Consulting Engineers was appointed to apply our engineering capability and environmental expertise to secure planning permission for the 24MW Lisheen III Wind Farm development.  The 8 No. turbine wind farm is located approximately 3km west of Crosspatrick village with …

Galmoy Ireland
October 22, 2019

TOBIN prepared a source protection plan for the existing wells similar to work we are currently carrying out across the country with the Geological Survey of Ireland (GSI).  The technical standard achieved within the Source Protection Zone (SPZ) delineation was …

shannon airport runway
October 4, 2019

The project consisted of the reconstruction and complete overlay of the Turnpad 06, Shoulder and Apron Areas at Shannon Airport. In our role as Lead Consultant for the various elements of these works, TOBIN acted as the single point of …

shannon airport terminal
October 4, 2019

Shannon Airport Terminal Building Upgrade was a programme that consciously modernised the building facilities contributing to an enhanced passenger experience, which also derived renewed value from existing assets. TOBIN’s Quantity Surveying Services consisted of Cost Planning, Cost Control, Preparation of …