Primary Care Centres

TOBIN is proud to have been involved in the Primary Care Centres PPP Programme, which brought primary care centres to patients and communities all around Ireland. Each of the Primary Care Centres do not just provide primary care and GP services to local patients, but also include dental services, physiotherapy, occupational therapy, counselling, and more. […]
Westport Primary Care Centre, Mayo

TOBIN provided Civil and Structural Design Services for the construction of the Westport Primary Care Centre in Co. Mayo. The total building footprint is approximately 2,450m² over part 2 / part 3 storey and is situated on a steeply sloping site enclosed by residential buildings. The structure consists of a concrete framed structure on piled […]
Coolock Primary Care Centre

TOBIN provided Civil and Structural Engineering Design Services for the construction of a multi-storey Primary Care Centre comprising of a precast concrete frame structure at Coolock, Co. Dublin. The total building footprint is approximately 4,300m² over part 2/part 3 storey. Site works included the demolition of an existing HSE Administration Building and Health Centre Building, […]
Summerhill Primary Care Centre

TOBIN Consulting Engineers delivered the Civil and Structural Engineering Services on this new €16m high-spec healthcare and administration building in the Summerhill area of Dublin city. The total building footprint is approximately 4,479m² over part 2 and part 3 storeys. The building structure is made up of precast concrete framed structure with strip footing. Site […]
Tuam Primary Care Centre

TOBIN provided Civil and Structural Design Services for the construction of a 2 storey Primary Care Centre comprising a concrete frame structure at Sean Purcell Road, Tuam, Co. Galway. The total building footprint is approximately 2,600m² over 2 storeys on a site of 2.2ha. Site works included foul, storm and water main infrastructure, roads, parking […]
Claremorris Primary Care Centre

TOBIN provided Civil and Structural Design Services for the construction of a 2 / 3 storey Primary Care Centre with a concrete frame structure at Claremorris, Co. Mayo. The total building footprint is approximately 2,166m² over part 2 / part 3 storey. Site works included the demolition of the existing building, the provision of foul, […]