Lufthansa Tecknik Internal Wall Demolition

The works will involve internal modifications to the existing Hangar Building which comprise of the demolition and removal of an existing internal wall of approximately 54 meters in length and 20 meters in height. The wall is constructed of block work from ground floor level to a height of 3 meters above ground floor level, […]
Shannon Airport – Turnpad & Runway Extension

The project consisted of the reconstruction and complete overlay of the Turnpad 06, Shoulder and Apron Areas at Shannon Airport. In our role as Lead Consultant for the various elements of these works, TOBIN acted as the single point of contact for the client throughout all stages of the Contract. This consisted of providing SAA […]
Shannon Airport, Fire Upgrade Works

Shannon Airport Terminal Building Upgrade was a programme that consciously modernised the building facilities contributing to an enhanced passenger experience, which also derived renewed value from existing assets. TOBIN’s Quantity Surveying Services consisted of Cost Planning, Cost Control, Preparation of Tender Documents including detailed BoQ, management of procurement through e-tenders, Tender Evaluations, Contract Administration, Final […]
Upgrade to Shannon Airport Terminal

TOBIN Consulting Engineers was the Lead Consultant providing Project Management, Civil & Structural Engineering, Building Services (M&E), Quantity Surveying and PSDP Services, as well as acting as Employer’s Representative through to Handover Stage. Works consisted of upgrade and refurbishment works to Shannon Airport, which included complete refurbishment works to the Arrivals Hall, Immigration Hall, and […]
Multi-Storey Carpark Extension, Dublin Airport

This project involved the design and construction of an extension to the existing multi-storey car park consisting of the following facilities: Four additional car park levels Vertical circulation core with lifts Plant areas The facility was constructed in an airport / restricted environment and was handed over on a phased basis once each additional car […]
Lufthansa Technik Temporary Hangar Structure

Faced with an unprecedented and indeed technical dilemma of sorts at Shannon Airport, Lufthansa Technik Shannon Ltd. approached TOBIN Consulting Engineers to find a way of accommodating a Boeing 787-8 at their maintenance base. The problem we faced here was predominantly with the sheer size of this particular Boeing in relation to the size of […]