Refurbishment and Office Fit-out of Building 156

Originally completed in 2002, this four-storey building was originally designed to a high Architectural standard to function as a passively cooled and ventilated atrium office building. However, during its occupancy the building tenants experienced significant issues, of solar glare, overheating in the summer and excessive cooling in the winter. Hence, the project required thermal modelling […]
Irish Rail Major Roofing Refurbishment Projects

Works consisted of design, tender documentation, PSDP, commercial support, construction supervision and project management of refurbishment works on 5 buildings at Limerick and Inchicore depots. The existing roofs were suffering from varying defects which were impacting the operational functionality of the buildings. The existing roofs varied from steel to timber structures with coverings of Single […]
NUIG Sports Facilities at Dangan Sports Ground, Galway

National University of Ireland Galway appointed TOBIN to carry out a condition survey of their existing sports facilities at Dangan Sports Ground in Galway. Following this survey, Tobin proposed a preliminary report providing recommendations and necessary improvement and upgrade works to accommodate current and future usage for both the college and external users. This involved […]
University of Limerick, Running Track

The works required the removal and disposal of the existing track surface, the removal and replacement of the existing perimeter fence and gates, along with the excavation and disposal of material for and construction of a new retaining wall and track sections. New kerbing was placed to form a new 100m straight to the track […]
North City Operations Depot of Dublin City Council – Ballymun

TOBIN, as part of a multi-disciplinary team, was appointed by Dublin City Council in 2017 to provide Civil and Structural Engineering, PSDP, Quantity Surveying, Fire Consultant, Traffic and Environmental Services from Stage (i) to Stage (v) to develop the design for the amalgamation of 7 depots spread throughout Dublin City to one central location at […]
Charles River Laboratories Redevelopment Project, Ballina.

This project consisted of the provision of new office and laboratory space within their existing facility, as well as a plant room and compound, an external carpark, and other site infrastructure. The project entailed the delivery of the following from Stage 1, Preliminary Design through to Stage 5, Handover: · Detailed design and planning of […]