Ward River Valley Regional Park

TOBIN Consulting Engineers provided PSDP services on the recently completed Ward River Valley Park. This Recreational Hub is part of the 200-acre Ward River Regional Park and features newly developed grass pitches as well as a third-generation all-weather sports pitch with innovative LED floodlighting. Services provided by TOBIN Consulting Engineers on this project: PSDP
NUI Galway Connacht GAA Air Dome, Mayo

TOBIN is proud to have delivered the world’s largest Sports Air Dome for Connacht GAA in Bekan, Co. Mayo. The Smart Air Dome is located on the site of the Connacht GAA ‘Centre of Excellence’ and measures 150m (l) x 100m (w) x 26m (h). This highspec facility accommodates a full size 4G synthetic GAA […]
Sport Ireland National Indoor Arena (Phase 1)

This state-of-the-art facility included the development of three individual areas: The National Indoor Training Centre, the National Gymnastics Training Centre and the National Indoor Athletics Training Centre. This fully accessible, multi-sport and multi-purpose arena is the newest of its kind in Europe and is based within the 520-acre National Sports Campus. The National Indoor Arena […]
Sport Ireland National Indoor Arena (Phase 2)

The National Indoor Arena houses three indoor arenas, each one as impressive as the next. The arena has a signature structure that ranges in height from 12 to 17 metres over three levels. Phase 2 of the National Indoor Arena provides permanent indoor facilities for Ireland’s three leading field sports, namely, Gaelic Games, Soccer and […]
GAA Centre of Excellence

TOBIN partners with the GAA for Connacht Centre of Excellence. TOBIN provided multidisciplinary services for this state-of-the-art facility for Connacht GAA where works were completed over 3 separate phases. Phase 1 included the construction of 5 sand-topped pitches, a 3G synthetic pitch and a 2.2km running track. Phase 2 comprised of the construction of a […]
Sports Infrastructure project at the University of Limerick

Covering a total area of 35,000m², this project involved the provision of 2 full-size GAA pitches, 4 soccer pitches, 1 natural turf pitch, 2 ball walls, a spectator terrace area, floodlighting, access roads, coach parking and set down areas, site services, associated site development works and landscaping. The existing 400m, 8-lane all-weather running track, adjacent […]