Drummin Village Residential Development

This project involved the initial inspection of 145 residential units in Nenagh, Co. Tipperary. Remedial works as identified by TOBIN Consulting Engineers were carried out on all units. As PSDP, TOBIN  liaised with the temporary works designers and all other relevant designers, to ensure coordination of their design activities in protecting the safety of all personnel […]

Shannon Airport

TOBIN’s work with the Shannon Airport Authority (SAA). Shannon Airport, located in County Clare, is one of only three international airports in Ireland. The Shannon region in the west of Ireland is synonymous with FDI investment and expansive multinational activity across a number of key sectors, namely the pharmaceutical and medical device industries. The airport […]

GAA Centre of Excellence

TOBIN partners with the GAA for Connacht Centre of Excellence. TOBIN provided multidisciplinary services for this state-of-the-art facility for Connacht GAA where works were completed over 3 separate phases. Phase 1 included the construction of 5 sand-topped pitches, a 3G synthetic pitch and a 2.2km running track. Phase 2 comprised of the construction of a […]

Bunratty Folk Park and Retail Unit

Bunratty Retail Park

As part of a continued commitment to both sustain and promote this vital local employment hub, Shannon Heritage set out to complete a major upgrade of the facilities. TOBIN was appointed to oversee this exciting project. The main work elements included a new retail area covering the previous courtyard between the original retail space and […]

Sports Infrastructure project at the University of Limerick

Covering a total area of 35,000m², this project involved the provision of 2 full-size GAA pitches, 4 soccer pitches, 1 natural turf pitch, 2 ball walls, a spectator terrace area, floodlighting, access roads, coach parking and set down areas, site services, associated site development works and landscaping. The existing 400m, 8-lane all-weather running track, adjacent […]

Lufthansa Tecknik Internal Wall Demolition

internal wall demolition

The works will involve internal modifications to the existing Hangar Building which comprise of the demolition and removal of an existing internal wall of approximately 54 meters in length and 20 meters in height. The wall is constructed of block work from ground floor level to a height of 3 meters above ground floor level, […]