NUI Galway Connacht GAA Air Dome, Mayo

TOBIN is proud to have delivered the world’s largest Sports Air Dome for Connacht GAA in Bekan, Co. Mayo. The Smart Air Dome is located on the site of the Connacht GAA ‘Centre of Excellence’ and measures 150m (l) x 100m (w) x 26m (h). This highspec facility accommodates a full size 4G synthetic GAA […]
Sport Ireland National Indoor Arena (Phase 1)

This state-of-the-art facility included the development of three individual areas: The National Indoor Training Centre, the National Gymnastics Training Centre and the National Indoor Athletics Training Centre. This fully accessible, multi-sport and multi-purpose arena is the newest of its kind in Europe and is based within the 520-acre National Sports Campus. The National Indoor Arena […]
Sport Ireland National Indoor Arena (Phase 2)

The National Indoor Arena houses three indoor arenas, each one as impressive as the next. The arena has a signature structure that ranges in height from 12 to 17 metres over three levels. Phase 2 of the National Indoor Arena provides permanent indoor facilities for Ireland’s three leading field sports, namely, Gaelic Games, Soccer and […]
Shannon Airport

TOBIN’s work with the Shannon Airport Authority (SAA). Shannon Airport, located in County Clare, is one of only three international airports in Ireland. The Shannon region in the west of Ireland is synonymous with FDI investment and expansive multinational activity across a number of key sectors, namely the pharmaceutical and medical device industries. The airport […]
Sports Infrastructure project at the University of Limerick

Covering a total area of 35,000m², this project involved the provision of 2 full-size GAA pitches, 4 soccer pitches, 1 natural turf pitch, 2 ball walls, a spectator terrace area, floodlighting, access roads, coach parking and set down areas, site services, associated site development works and landscaping. The existing 400m, 8-lane all-weather running track, adjacent […]
Thermo King Receiving Area Extension, Galway

This project consisted of the construction of a 329m² ground floor area extension to the existing receiving area including the provision of 2 no. additional loading docks and all associated siteworks and was completed on Jan 2020. An existing roller shutter door was relocated from the west to the North West façade of the existing […]