Dundalk Main Drainage and Waste Water Disposal Scheme

The Dundalk Wastewater Treatment Plant was commissioned in 2000 for a design BOD capacity of 179,535p.e. TOBIN prepare a Preliminary Report which included:

  • Examination of the performance of the existing wastewater treatment plant
  • Assessment of the loading on the existing plant
  • Modelling of the process units to assess the capacity of the plant
  • Modelling to assess the adequacy in relation to hydraulic and biological loadings
  • Examination and presentation of options for the upgrade of the wastewater treatment plant

The overall project included sewer rehabilitation, the refurbishment of five major pumping stations and the construction of a waste water treatment plant contract for a population equivalent of 179,535p.e and consisted of 8 contracts.

Similar Projects

Galway Harbour Project

Re-engaging with Galway’s maritime past – TOBIN and the Galway...

leixlip

Leixlip Water Treatment Plant

TOBIN was appointed as Client’s Representative for the Stage 5...

GAA Centre of Excellence

TOBIN partners with the GAA for Connacht Centre of Excellence....

Diamond Hill Walkway

There are few sights on the Western seaboard quite as...