Block R – R&D Technology Facility Development

TOBIN were appointed by Shannon Commercial Enterprises DAC as Civil and Structural Engineers & PSDP for the development of the c40,000 sq.ft. R&D Technology Facilities in Shannon Free Zone including all site development works. The building, which was completed in an accelerated 10-month build programme, is located on a c2.6-acre site adjacent to the main […]

Kingspan Stadium – Ulster Rugby

This project included the replacement of the existing grass playing pitch with a new synthetic surface playing pitch, new drainage works for the pitch and installation of irrigation pipework all at the Kingspan Stadium, Belfast. The works also involved the excavation and disposal offsite to a suitably licensed facility of the existing grassed playing pitch […]

105, Salthill

This project consisted of the demolition of the existing bungalow at 105 Salthill Road Upper and the construction of 39 luxury apartments with balconies. The development consists of 2 blocks: Block A is a seven-storey building facing onto the Salthill Promenade, comprising of 27 apartments. Block B is a four-storey building facing onto Lower Salthill […]

North City Operations Depot of Dublin City Council – Ballymun

TOBIN, as part of a multi-disciplinary team, was appointed by Dublin City Council in 2017 to provide Civil and Structural Engineering, PSDP, Quantity Surveying, Fire Consultant, Traffic and Environmental Services from Stage (i) to Stage (v) to develop the design for the amalgamation of 7 depots spread throughout Dublin City to one central location at […]

DCU Morton Stadium

This project comprised of the replacement of the existing athletic track surface with a Class 2 IAAF Prefabricated Running Track including new double long jump and triple jump facilities, hammer and discus throwing facilities, indoor sprint track, pole vault facilities and all associated site infrastructure including fencing, drainage and ducting.  The new synthetic track is […]

Ward River Valley Regional Park

TOBIN Consulting Engineers provided PSDP services on the recently completed Ward River Valley Park. This Recreational Hub is part of the 200-acre Ward River Regional Park and features newly developed grass pitches as well as a third-generation all-weather sports pitch with innovative LED floodlighting. Services provided by TOBIN Consulting Engineers on this project:   PSDP