• July 6, 2021

    TOBIN Consulting Engineers provided full Civil & Structural Engineering and PSDP Services on this project which involved the retrofit of Bay 37 A & B, formerly known as the Boart building (which adjoins airport lands) to include for: ISO Clea …

  • July 6, 2021

    The hangar was designed to accommodate an A380 Aircraft among various other combinations of aircraft. The gross internal floor area of the hangar building is 8,447m² and includes office space, workshops, plant rooms and storage space. Ancillary build …

  • March 6, 2020

    TOBIN Consulting Engineers provided Civil and Structural Engineering, Quantity Surveying and PSDP for the new industrial manufacturing building at Poolboy, Ballinasloe, Co. Galway. The building consisted of a 3600sqm production area and with 5m eaves …

  • December 6, 2019

    The Volvo/Citroen Car Showroom is located on a serviced 15-acre site within the City North Business Park in Galway. The building consists of a 7.5m high single storey car showroom and workshop with mezzanine offices over a basement carpark (59 spaces …

  • June 12, 2019

    Faced with an unprecedented and indeed technical dilemma of sorts at Shannon Airport, Lufthansa Technik Shannon Ltd. approached TOBIN Consulting Engineers to find a way of accommodating a Boeing 787-8 at their maintenance base. The problem we faced h …

  • June 7, 2019

    The Vartry Water Supply Scheme provides drinking water for over 200,000 people. With historical significance, it was developed by Dublin Corporation in the 1860s and includes two reservoirs, a water treatment plant, a 4km tunnel under Callowhill and …

  • BIA Innovator Campus - Athenry
    June 7, 2019

    Falling in line with the designation of Galway as European Region of Gastronomy for 2018, the TOBIN-led BIA Innovator Campus was approved to be delivered in Athenry, Co. Galway. TOBIN Consulting Engineers are working closely with Bia Innovator Campus …

  • July 12, 2018

    TOBIN Consulting Engineers were appointed by Offaly County Council for the construction of a new Fire Station in Ferbane. Works also included site development works and site drainage, installation of new foul and surface water sewers and foul treatme …

  • July 10, 2018

    Works consisted of the construction of a new fire station on the outskirts of Monaghan Town Centre. The building is a large industrial type building in excess of 5,000 sq.m and was constructed using a steel frame structure, with a large concrete slab …

Start typing and press Enter to search