• February 8, 2020

    This project consisted of the construction of a 329m² ground floor area extension to the existing receiving area including the provision of 2 no. additional loading docks and all associated siteworks and was completed on Jan 2020. An existing roller …

  • Universal House
    June 7, 2019

    TOBIN Consulting Engineers was commissioned by Shannon Commercial to undertake a Condition Survey and prepare a Report on vacant office premises at Universal House, Shannon Free Zone, Co. Clare. The purpose of this report was to present the client wi …

  • BIA Innovator Campus - Athenry
    June 7, 2019

    Falling in line with the designation of Galway as European Region of Gastronomy for 2018, the TOBIN-led BIA Innovator Campus was approved to be delivered in Athenry, Co. Galway. TOBIN Consulting Engineers are working closely with Bia Innovator Campus …

  • Block C Shannon
    June 7, 2019

    TOBIN Consulting Engineers delivered the Civil and Structural Engineering Services on this new €10m high spec office block development in the Shannon Free Zone. This state-of-the-art project has been brought to fruition by Shannon Commercial Properti …

  • High Performance Training Centre
    August 7, 2018

    The facility is a single-storey building and consists of an Indoor Training Area including a 4-lane 130-metre running track with performance analysis facilities, a dedicated boxing gym consisting of 4 training rings and one full-size competition ring …

  • Campus Conference Centre
    August 7, 2018

    TOBIN Consulting Engineers was the Lead Consultant for Sport Ireland’s National Sports Campus ‘Campus Conference Centre’ (CCC) project. This new CCC building now serves as a centrally located outlet for administrative, business and social activities …

  • July 12, 2018

    TOBIN Consulting Engineers were appointed by Offaly County Council for the construction of a new Fire Station in Ferbane. Works also included site development works and site drainage, installation of new foul and surface water sewers and foul treatme …

  • July 10, 2018

    Works consisted of the construction of a new fire station on the outskirts of Monaghan Town Centre. The building is a large industrial type building in excess of 5,000 sq.m and was constructed using a steel frame structure, with a large concrete slab …

  • July 9, 2018

    TOBIN Consulting Engineers were appointed by Kilkenny County Council for the construction of a new Fire Station and Training Tower in Graiguenamanagh. The scope of works required the excavation of ground to required formation level and construction o …

Start typing and press Enter to search