Telecommunications Mast at Edermine, Enniscorthy, Co. Wexford

irish rail edermine

Iarnród Éireann’s (IÉ) existing Train Radio system, which provides for safety critical communications between the train drivers and controlling signalmen for train management and regulation, is technologically obsolete and life expired. A programme is currently being undertaken by IÉ to replace the existing analogue system with a GSM-R system, which is mandated for the application […]

Hydrogeological Investigation – Evidence Based Cryptosporidium Risk Assessment for the Portlaoise Water Supply Scheme

portlaoise 2

Portlaoise Public Water Supply (PWS) (Drinking Water Code 1600PUB1004) was placed on the Remedial Action List (RAL) in 2014 due to ‘inadequate treatment for Cryptosporidium’.  Nine production wells currently abstract 9,900 m3/d from a Regionally Important Karst Aquifer and a Locally Important Aquifer that is Moderately Productive only in Local Zones. The report forms an evidence […]

Lisheen III Wind Farm Planning Applications

Lisheen III

TOBIN Consulting Engineers was appointed to apply our engineering capability and environmental expertise to secure planning permission for the 24MW Lisheen III Wind Farm development.  The 8 No. turbine wind farm is located approximately 3km west of Crosspatrick village with the turbine layout lying within two counties; Co. Kilkenny and Co. Laois. The works also […]

Galmoy PWS

Galmoy Ireland

TOBIN prepared a source protection plan for the existing wells similar to work we are currently carrying out across the country with the Geological Survey of Ireland (GSI).  The technical standard achieved within the Source Protection Zone (SPZ) delineation was that of the Geological Survey of Ireland, both in terms of implementation and reporting. SPZ […]

Shannon Airport – Turnpad & Runway Extension

shannon airport runway

The project consisted of the reconstruction and complete overlay of the Turnpad 06, Shoulder and Apron Areas at Shannon Airport. In our role as Lead Consultant for the various elements of these works, TOBIN acted as the single point of contact for the client throughout all stages of the Contract. This consisted of providing SAA […]

Shannon Airport, Fire Upgrade Works

shannon airport terminal

Shannon Airport Terminal Building Upgrade was a programme that consciously modernised the building facilities contributing to an enhanced passenger experience, which also derived renewed value from existing assets. TOBIN’s Quantity Surveying Services consisted of Cost Planning, Cost Control, Preparation of Tender Documents including detailed BoQ, management of procurement through e-tenders, Tender Evaluations, Contract Administration, Final […]